Home / Asphalt Plants / Super GT
E-MAK SUPER GT · IRELAND & UK
E-MAK Super GT
asphalt plants.
Asphalt production from 200–350 tonnes per hour, with an enclosed mixing tower and integrated storage options. Explore Super GT with OB Plant, E-MAK agent for Ireland and the UK.
ENGINEERED BY
200–350 t/hPublished production range
Enclosed towerFully enclosed mixing section
RAP integrationRecycling tower configuration
PRODUCTION, STORAGE & RECYCLING
Capacity for your workload.
Storage for your operation.
Super GT brings together a fully enclosed mixing tower, high-volume hot aggregate storage and options for storing up to five asphalt types at the same time.
OB Plant can help you work through the production range, mix requirements and RAP integration, then plan the storage and site layout around your operation.

WHY SUPER GT?
Bring production
and storage together.
Start with the asphalt you need to produce, then work through the equipment, storage and recycling requirements.
01
Enclosed mixing tower
A fully enclosed tower forms the centre of the Super GT installation.
02
Hot aggregate storage
High-volume hot aggregate bunkers, with the required capacity agreed for your plant.
03
Multiple asphalt types
Storage for up to five asphalt types simultaneously, subject to the selected configuration.
04
RAP integration
A recycling tower can be integrated. Discuss your reclaimed asphalt requirements with OB Plant.
05
Burner control
A moisture sensor enables automatic burner flame control.
06
Additive systems
Granular, liquid and packaged additives can be included in the equipment discussion.
| Production capacity | 200–350 tonnes/hourAcross the Super GT range |
|---|---|
| Mixing tower | Fully enclosedConfirm the final tower arrangement |
| Hot aggregate storage | High-volume bunker designCapacity to be agreed for your installation |
| Asphalt storage | Up to five asphalt typesSubject to the selected configuration |
| RAP integration | Recycling tower integrationConfirm equipment and intended RAP content |
| Additive systems | Granular, liquid and packagedEquipment to suit your mix requirements |
The capacity range follows E-MAK’s Super GT model detail page. Actual output, storage volumes and recycling capability depend on the selected equipment, materials and operating conditions. Confirm your specification with OB Plant.
Output & mix range
Target hourly production, intended asphalt types and additive requirements.
Storage & dispatch
The mix volumes you need to hold, loading patterns and vehicle movements.
RAP & site layout
Reclaimed material requirements, available space and the layout of the full installation.
Can Super GT be configured for RAP?
E-MAK describes recycling tower integration for Super GT. The suitable equipment and RAP proportion need to be confirmed against your materials, mix designs and selected plant.
Can it store different asphalt types?
E-MAK lists storage for up to five asphalt types simultaneously. Discuss the number of mixes and the volume of each with OB Plant to agree the configuration.
What hot aggregate storage capacity is available?
Super GT uses high-volume hot aggregate bunkers. The required tonnage and arrangement should be confirmed in your quotation; hot aggregate storage is separate from finished asphalt storage.
What should I include in an enquiry?
Include your project location, target output, intended mixes, storage needs and any RAP requirements. A site plan and an outline of your loading arrangements will also help.
YOUR NEXT STEP
Let’s talk about
your Super GT plant.
Planning a new installation or exploring your options? Tell us what you need and our team will be in touch.
Interested in the E-MAK Super GT range? Include your project location and target output so we can discuss the next step.
Your details will be handled in line with our Privacy Policy.